Published 04/03/2025 at 562 × 1262 in Analysis and Optimisation of High Pressure Die Casting Parameters to Achieve Six Sigma Quality Product Using Numerical Simulation Approach Figure 15: (a, b, and c) Simulation output for solidification time at rotor component, Cross-Section AA and BB. Figure 15: (a, b, and c) Simulation output for solidification time at rotor component, Cross-Section AA and BB.